翻訳と辞書 |
Taichung Line : ウィキペディア英語版 | Taichung Line
}} The Taichung Line (), also known as the Mountain Line (), is a line of the Taiwan Railway Administration. It is It has a total length of 85.5 km, of which all but 2.2 km (the Chengzhui Line from Chenggong to Zhuifen) is double track.〔(Taiwan Railways Administration )〕 ==History== The Taichung Line was completed in 1908. After the Coast Line between Zhunan and Changhua was finished in 1922, the original line was called Taichung Line. In 1998, the construction to expand to two tracks (double tracks) was completed. Long tunnels were built to reduce the grade of the line. Sanyi Tunnel is one of the longest railway tunnels in Taiwan. The opening of the new segment of the line relegated the previous segment of the line to become the Old Mountain Line. Currently, the Railway Reconstruction Bureau is transforming the section of the line from Fengyuan to Daqing into an elevated line. Slated for completion in 2017, the project will replace Fengyuan, Tanzi, Taiyuan, Taichung, and Daqing Stations with new, elevated stations, and create the new stations Fengnan, Toujiacuo, Songzhu, Jingwu, and Wuquan.〔(【引用サイトリンク】title=Railway Reconstruction Bureau - Projects )〕
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Taichung Line」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|